Jump to main content

Attractions

Dome of Light

Dome of Light

[Ctrl] + [+]:May amplify the font size,[Ctrl] + [-]:May attenuate the font size

Main Stadium

  • Architecture
  • Livable City
  • World Games (National Sports Complex)
  • Zuoying Dist.
Main Stadium
The whole construction of the Main Stadium, with a capacity of 40,000 seats, designed by Toyo Ito, only required two years of work, and was finally tested for lighting facilities on January 15, 2009. It took over six minutes to power up the lighting in the stadium, which illuminates the track and field with 3,300 lux. Two jumbotrons screens on each side of the stadium, along with a surround sounding system, make this an international standard soccer field and facility, ensuring that it is the perfect venue for the opening and closing ceremonies, as well as the Rugby 7s and Flying Disc events. The City of Kaohsiung is particularly proud of this project. During the construction period, no site accidents occurred, while the construction crew successfully overcame the technical difficulties presented by installing spiral steel girders and 8,844 solar panels on the roof.
  • Location
  • Peripheral Search
QRCode

Use a cell phone to scan the above QR Code to quickly obtain information

Related Information

Tel

+886-7-5829000

Add

No.100, Shihyun Blvd., Zuoying Dist., Kaohsiung City, Taiwan (R.O.C.)

Opening Hours

09:00-1700

How to Get There

Route planning (Click and then, in accordance with your departure point, plan the transportation route that best suits you.)
Total Visitors:6654
Last Updated:2017-07-12 10:22:28

留言